Boiler System Condensate Tank Project

Boiler System Condensate Tank Project

The project at Springfield High School, 49 West Leamy Avenue, Springfield, Pennsylvania consisted of the isolation, draining and removal of a 515 gallon steel condensate receiver tank and replacing it with a new stainless steel tank of the same size. All connections were reutilized to provide a complete and operational condensate/vacuum water system. In addition GEM replaced the duplex vacuum receiver tank, associated vacuum pumps and accessories, as well as the control panel with associated controls.

No Extra Photos

No Extras Photos for this Project.

​

​

​

​

​

PROJECT OWNER

School District of Springfield Township

ARCHITECT / ENGINEER

Shiller and Hersh Assoc.

PROJECT COMPLETED

11/30/11